About us & our service;
We are proud to offer our own team of fully qualified craftsmen covering all trades including design services. All installations are carefully managed from start to finish with a project manager assigned to each project, providing a fully bespoke service no matter the size of the installation. We pride ourselves on the quality of the products we supply and the quality of our installation, as well as our after sales service and guarantees.
Please see below a breakdown of some of the most popular projects we under take; all prices include vat @ 20%
Bedrooms – Full installation
An average bedroom takes 3 – 5 days to complete and includes the following; Preparation, electrical installation, flooring alteration, cabinet installation and wardrobe installation. This price also includes the supply of our cabinets, which are fully bespoke with solid backs and come with adjustable shelving and soft close hinges & drawer runners plus a multitude of storage options.
Average Spend £5,000+
Bathrooms – Full Installation;
An average full bathroom takes 3 weeks to complete and includes the following; Preparation, electrical installation, plumbing installation, full plastering, tiling, flooring, cabinet installation, decorating. The price below includes the work as listed above and an average spend for the supply of suite, tiles, lighting and flooring.
Average Spend £10,000 – £15,000
Kitchens – Full installation
An average kitchen takes 4 – 6 weeks to complete and includes the following; Preparation, electrical installation, plumbing installation, full plastering, tiling, flooring, cabinet installation, worktops/splash backs and decorating. The price below also includes the supply of cabinets, worktops, tiles, lighting and flooring. Our cabinets are fully bespoke with solid backs and come fully assembled to the highest standard.
Average Spend £20,000 – £40,0000 +
Kitchen Knock Through – Full installation
An average kitchen knock through takes an additioanl 2 weeks to complete on top of a normal kitchen installation and includes the following; Preparation, building works, structural engineer and building control services.
Additional Average Spend £5,000 – £10,000
Rear Extension – Full installation (excludes kitchen supply & installation)
An average rear extension takes 12-16 weeks to complete and includes the following; Preparation, architectural plans, structural engineer and building control services, building works, windows & bi fold aluminum doors, electrical installation, plumbing installation, full plastering, tiling, roofing, landscaping, flooring and decorating. The price below also includes structural and building control services plus the supply of heating, lighting and flooring. Please note an average per square meter cost, ranges around £3,000.00 inc vat for the finished shell depending on the specification.
We hope that the above information has been helpful in aiding you to assess if we are the right firm for your project and look forward to working with you.
Useful Links
Hours & Info
Archive
- September 2020
- January 2019
- February 2017
- January 2017
- December 2016
- November 2016
- September 2016
- August 2016
- July 2016
- June 2016
- May 2016
- September 2013
- August 2013
- December 2012
- November 2012
- September 2012
- August 2012
- July 2012
- June 2012
- May 2012
- April 2012
- February 2012
- January 2012
- September 2011